CORVA: BLANK PLUMBING WORK-ORDER TEMPLATE For landlords, agents and property teams | Revision: 17 October 2026 Guide: https://corva.co.uk/advice/property-maintenance-work-orders/ Use one copy per property or unit. Replace the blank fields with the information needed for your request. Keep completed copies private. Do not include key codes, medical details or payment information. 1. PROPERTY AND REFERENCE Organisation placing the request: Job reference / purchase-order reference: Full property address and postcode: Unit, room or fitting location: Date of request / revision: 2. WHAT IS BEING REQUESTED? Select: inspection only / quotation / repair already approved Reported symptoms (what was observed, not an assumed diagnosis): When the issue started / whether it has happened before: Facilities affected and practical impact on occupants: Known fitting or appliance make, model and fuel, if relevant: Previous visit or quotation reference, if available: Requested tasks (number each item): Work excluded / responsibilities of other contractors: Who supplies any specified fittings or materials: 3. AUTHORITY AND COST CONTROL Person or role authorised to approve this instruction: Agreed quotation reference or charging basis, if already confirmed: Approved scope and spending limit, if applicable (state VAT basis): How approval for additional work will be obtained: Do not treat an unanswered request as approval for extra work. 4. ACCESS AND PLANNING Occupied or vacant / access arranged by: Contact route for arranging access (use your agreed private channel): Preferred dates or deadline and the reason it matters: Site induction, accompaniment or working-hour restrictions: Known utility or shared-facility restrictions relevant to the visit: Who needs appointment or delay updates: Preferred dates are not confirmed appointments. 5. HANDOVER REQUESTED BEFORE THE VISIT Required job notes and relevant photographs: Specific inspection records requested, where applicable: Private destination for completion information: Invoice reference and agreed invoicing instructions: 6. COMPLETION / FOLLOW-UP (FILL IN AFTER THE VISIT) Visit date and job reference: Work actually completed, by numbered task: Findings or limitations reported by the contractor: Outstanding work / further quotation needed: Follow-up owner and agreed next action: Records received and invoice reference: A completion note relates to the work done, not certification of every system. USING THIS WITH CORVA This blank template does not submit an enquiry or dispatch an engineer. Corva reviews the job, full postcode, scope, charges and availability before accepting work. For urgent attendance enquiries, telephone 01745 507102; do not wait for a completed form to be read. Attendance must be confirmed. For planned work: https://corva.co.uk/book/ Contact: 01745 507102 | teams@corva.co.uk | https://corva.co.uk/